Planar reactor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10134522
APP PUB NO 20170154724A1
SERIAL NO

15046423

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A planar reactor includes a core and a coil. The core includes an upper board, a lower board and a pillar. The pillar is located between the upper board and the lower board. A winding space is located among the upper board, the lower board and the pillar. The coil is wound around the pillar and located in the winding space. The pillar and at least one of the upper board and the lower board are coplanar at a first side of the planar reactor. The pillar is sunk into the winding space from a second side of the planar reactor, wherein the first side is opposite to the second side. A first end of the coil is exposed from the first side of the planar reactor. A second end of the coil is hidden in the winding space partially or wholly at the second side of the planar reactor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CYNTEC CO LTDNO 2 R&D 2ND RD SCIENCE-BASED INDUSTRIAL PARK HSINCHU

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hsieh, Hsieh-Shen Hsinchu, TW 27 82
Lin, Chu-Keng Hsinchu, TW 42 269
Lin, Hung-Chih Hsinchu, TW 117 1212
Zhang, Wei Shanghai, CN 2625 19909

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 20, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 20, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00