N-phase polarity data transfer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10134272
APP PUB NO 20170309167A1
SERIAL NO

15649178

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

System, methods and apparatus are described that facilitate transmission of data, particularly between two devices within an electronic apparatus. Data is selectively transmitted as N-phase polarity encoded symbols or as packets on differentially driven connectors. A data transfer method comprises encoding data and control signals in a sequence of symbols to be transmitted on a plurality of connectors, and transmitting the sequence of symbols on the plurality of connectors. Each symbol may be transmitted using a combination of a phase state of a first pair of connectors, a polarity of a second pair of connectors, and a selection of at least one undriven connector. Transmission of each symbol in the sequence of symbols may cause a change of state for at least one of the plurality of connectors.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
QUALCOMM INCORPORATED5775 MOREHOUSE DRIVE SAN DIEGO CA 92121-1714

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Raskin, Glenn D Carlsbad, US 8 273
Wiley, George Alan San Diego, US 112 2950

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 20, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 20, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00