Optical device and method of controlling the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10133145
APP PUB NO 20170371226A1
SERIAL NO

15544442

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to embodiments of the present invention, an optical device is provided. The optical device includes a waveguide structure including a floating gate, and an optical waveguide arranged spaced apart from the floating gate, wherein the optical waveguide overlaps with the floating gate, a carrier injection portion arranged spaced apart from the floating gate, and an electrode arrangement, wherein, in response to a first voltage difference applied to the electrode arrangement, the optical device is configured to inject charge carriers from the carrier injection portion to the floating gate to cause a change in refractive index of the waveguide structure, and wherein, in response to a second voltage difference applied to the electrode arrangement, the optical device is configured to drive the charge carriers from the floating gate to the optical waveguide to deplete the charge carriers.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ADVANCED MICRO FOUNDRY PTE LTD11 SCIENCE PARK ROAD SINGAPORE 117385

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lo, Patrick Guo-Qiang Singapore, SG 12 117
Luo, Xianshu Singapore, SG 12 74
Song, Junfeng Singapore, SG 9 145

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 20, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 20, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00