DC-DC converter with pull-up or pull-down current and associated control method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10122258
APP PUB NO 20180083526A1
SERIAL NO

15826715

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A DC-DC converter includes an inductor, a switch module, and a pull-up circuit or a pull-down circuit. The inductor has a first node and a second node, and the second node is coupled to an output node of the DC-DC converter. The switch module is arranged for selectively connecting an input voltage or a ground voltage to the first node of the inductor according to a driving signal. The pull-up circuit is arranged for selectively providing a first current to the output node of the DC-DC converter. The pull-down circuit is arranged for selectively sinking a second current from the output node of the DC-DC converter. In addition, the first current or the second current is determined based on an inductor current flowing through the inductor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MEDIATEK INCNO 1 DUSING RD 1ST SCIENCE-BASED INDUSTRIAL PARK HSIN-CHU

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kuan, Chien-Wei Hsinchu County, TW 27 122
Lee, Chien-Lung Hsinchu, TW 21 260
Lin, Shih-Mei Taipei, TW 6 48
Meng, Che-Hao New Taipei, TW 10 48

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 6, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 6, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00