Multiple stage fuel pump

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10119509
APP PUB NO 20160123288A1
SERIAL NO

14930312

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multi-stage fuel pump includes a casing having a fuel intake formed on one side thereof and a fuel discharge port formed on the other side thereof, and a plurality of impellers provided within the casing, having a plurality of blades disposed on a circumferential surface in an outward direction of the circumferential surface and having blade chambers formed between the blades and penetrating through upper and lower surfaces of the impellers to allow fuel to be discharged and introduced to and from upper and lower sides of the blades, and formed in multiple stages, wherein fuel intaken through the fuel intake according to rotation of the impellers is discharged to the fuel discharge port through the blade chambers of the impellers, and the numbers of the blades of each of the impellers are different, thereby reducing blade passage frequency (BPF) noise generated according to rotation of the impellers.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COAVIS117 GONGDAN-RO YEONSEO-MYEON SEJONG-SI 30058

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Choi, Won Young Daejeon, KR 20 134
Sohn, In Seok Chungcheongbuk-do, KR 12 38
Yu, Gyu Sang Chungcheongbuk-do, KR 5 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 6, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 6, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00