Passive safety equipment for a nuclear power plant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10115488
APP PUB NO 20160247585A1
SERIAL NO

15024795

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides passive safety equipment, comprising: a cooling part formed to cool a first fluid, which is emitted from a reactor coolant system or a steam generator, and a second fluid in a housing; and a circulation induction sprayer which is formed to spray the first fluid emitted from the reactor coolant system or the steam generator into the cooling part, has at least part thereof open to the inside of the housing such that the second fluid flows thereinto according to a drop in pressure caused by the spraying of the first fluid, and sprays the second fluid with the inflown first fluid.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOREA ATOMIC ENERGY RESEARCH INSTITUTEDAEJEON KOREA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Choi, Suhn Daejeon, KR 7 31
Ha, Jae Joo Daejeon, KR 10 53
Han, Hun Sik Seoul, KR 12 43
Kang, Kyung Jun Daejeon, KR 8 28
Kim, Keung Koo Daejeon, KR 21 124
Kim, Young In Daejeon, KR 114 1325
Moon, Joo Hyung Daejeon, KR 11 54
Park, Cheon Tae Daejeon, KR 9 74
Ryu, Seung Yeob Daejeon, KR 3 13
Yi, Sung Jae Daejeon, KR 2 8
Yoon, Ju Hyeon Daejeon, KR 12 74

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00