Water dilutable polyvinyl fluoride paint and coating and method for manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10113081
APP PUB NO 20170240761A1
SERIAL NO

15238112

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of manufacturing a coating is provided, which includes applying a primer paint on a substrate, wherein the primer paint includes 100 parts by weight of a first PVF, 30-70 parts by weight of an assistance resin, 5-30 parts by weight of a curing agent, 100-120 parts by weight of a first latent solvent, 3-methoxy-3-methyl-1-butanol, and water. The first latent solvent, 3-methoxy-3-methyl-1-butanol, and water have a weight ratio of 60:10-20:40-60. The method also applies a finish paint on the primer paint, wherein the finish paint includes 100 parts by weight of a second PVF, 100-120 parts by weight of a second latent solvent, 3-methoxy-3-methyl-1-butanol, and water, wherein the second latent solvent, 3-methoxy-3-methyl-1-butanol, and water have a weight ratio of 50:10-20:30-60. The primer paint and the finish paint are baked and dried to form a coating.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GRAND TEK ADVANCE MATERIAL SCIENCE CO LTDTAIPEI 104

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hou, Rui-Gang Taipei, TW 3 0
Lin, Hsueh-Tso Hsinchu, TW 12 131
Zhong, Dick Arcadia, US 12 20

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00