Tri-state inverter, D latch and master-slave flip-flop comprising TFETs

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10110203
APP PUB NO 20170264275A1
SERIAL NO

15454405

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Tri-state inverter includes a n-TFET and a p-TFET, the drain of the n-TFET being connected to the drain of the p-TFET and to an output of the tri-state inverter, the gates of the n-TFET and p-TFET being connected to an input of the tri-state inverter, and a control circuit able to apply a first control voltage on the source of the n-TFET and a second control voltage on the source of the p-TFET, the values of the first and second control voltages being positive or zero, wherein, when the tri-state inverter is intended to work as an inverter, the value of the first control voltage is lower than the value of the second control voltage, and when the tri-state inverter is intended to be tri-stated, the value of the first control voltage is higher than the value of the second control voltage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COMMISSARIAT A L'ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVESBÂTIMENT LE PONANT D 25 RUE LEBLANC PARIS 75015

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Amara, Amara Sceaux, FR 7 30
Anghel, Costin Vanves, FR 8 35
Gupta, Navneet Grenoble, FR 24 68
Makosiej, Adam Grenoble, FR 19 43

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 23, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 23, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00