Concentrator photovoltaic module and the alignment device and method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10110164
APP PUB NO 20180091090A1
SERIAL NO

15279823

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention discloses a concentrator photovoltaic module and the alignment device and method thereof. A laser source is disposed on a top surface of an alignment device at a tilt angle. According to the optical alignment points on a circuit board, the circuit board and the concentrating lens can be aligned and thus completing assembling a concentrator photovoltaic module. The alignment device and method for concentrator photovoltaic module requires no optically inactive region to complete alignment. Thereby, the utilization of the sunlight and the output power efficiency of the concentrator photovoltaic module can be enhanced.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INSTITUTE OF NUCLEAR ENERGY RESEARCH ATOMIC ENERGY COUNCIL EXECUTIVE YUAN R O CNO 1000 WENHUA RD LONGTAN TOWNSHIP TAOYUAN COUNTY 325

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Chun-Yi Taoyuan, TW 63 477
Hong, Hwen-Fen Taoyuan, TW 43 81
Huang, Yi-Ya Taoyuan, TW 8 18
Lee, Yueh-Mu Taoyuan, TW 18 13
Shih, Zun-Hao Taoyuan, TW 22 17

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 23, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 23, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00