Fuel injection control device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10107225
APP PUB NO 20180230928A1
SERIAL NO

15884541

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cold-time fuel increasing section calculates, as increase correction values for a required injection amount, an increase-after-startup correction value, which attenuates with an increment of the number of times of combustion carried out after startup of the internal combustion engine, and a basic warmup increase correction value, which attenuates with an increase in a temperature of coolant in the internal combustion engine. The cold-time fuel increasing section calculates the increase correction values such that the increase-after-startup correction value when the port injection mode is selected is greater than the increase-after-startup correction value when the single direct injection mode is selected, and that the basic warmup increase correction value when the port injection mode is selected is less than the basic warmup increase correction value when the single direct injection mode is selected.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Idogawa, Masanao Toyota, JP 89 248
Kitazume, Akinori Nagoya, JP 6 24
Mizuno, Hiroyuki Toyota, JP 291 3429

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 23, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 23, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00