Multistage boiler heat exchange apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10094552
APP PUB NO 20180119945A1
SERIAL NO

15335575

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multistage boiler heat exchange apparatus has a combustion furnace and at least one boiler set. The combustion furnace is used to produce a heat source and has a furnace base and a hot-air passage. The at least one boiler set is connected to the combustion furnace, and each has a preheater and a boiler. The preheater is deposited adjacent to the combustion furnace, and is connected to and communicates with the hot-air passage to adjust temperature of the heat source that enters the preheater. The boiler is an uprightly-deposited cylinder, is connected to the preheater, and has a conducting pipe and an exchange tube. The conducting pipe is deposited on and communicates with the boiler to enable the heat source to enter the boiler. The exchange tube is deposited in the boiler and has an exchange medium to exchange heat with the heat source in the boiler.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUNCUE COMPANY LTDTAICHUNG CITY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lin, Jung-Lang Taichung, TW 17 31

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 9, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 9, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00