Panel assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10094133
APP PUB NO 20160369519A1
SERIAL NO

15101402

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a panel assembly adapted to absorb a blast effect. The panel assembly includes a panel adapted to be displaceably mounted to a frame, an extendable connecting assembly extending from the panel and adapted to be connectable to the frame so as to mount the panel to the frame, the extendable connecting assembly is adapted to extend in a longitudinal direction and in a controlled manner, such that the extendable connecting assembly includes, a controlling portion connected to the panel, and a connecting portion adapted to be connectable to the frame, the connecting portion glidably coupled to the controlling portion, such that the controlling portion is adapted to control the extension of the connecting portion from the controlling portion, such that the extendable connecting assembly is adapted to extend in a controlled manner to control the movement of the panel when receiving the blast effect.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AJA ENTERPRISES PTE LTDSINGAPORE 608586

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hong, Ting Toh Singapore, SG 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 9, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 9, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00