Synchronization system for power generation unit and method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10090681
APP PUB NO 20170207635A1
SERIAL NO

15320383

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Synchronization system and method for a power generation unit coupled to an electrical power system, in order to facilitate the synchronization between the power generation unit and the electrical power system. A synchronization signal (SS) is generated by means of at least one Phase-Locked Loop (4) from a main electrical signal (Se) received from the electrical power system. The Phase-Locked Loop (4) comprises a controller scheme with a plurality of gain parameters (Kmn) to eliminate at least some of the deviations of the synchronization signal (Ss) in respect of the main electrical signal (Se), and said gain parameters (Kmn) are adjusted depending on the frequency and the amplitude of said main electrical signal (Se).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INGETEAM POWER TECHNOLOGY S A48170 ZAMUDIO (BIZKAIA)

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Candela, Garcia Jose Ignacio Barcelona, ES 1 1
Catalan, Lago Pedro Zamudio, ES 1 1
Luna, Alloza Alvaro Barcelona, ES 1 1
Olea, Oregi Eneko Zamudio, ES 4 20
Rouzbehi, Kumars Barcelona, ES 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 2, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 2, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00