Acceleration and precision controlled ejection of mass

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10088263
APP PUB NO 20170232578A1
SERIAL NO

15430663

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Rotational motion generates velocity of a mass wherein the mass' release from the rotating system, becoming a projectile, and subsequent impact can result in cutting, abrasion, mixing of chemicals, coating, and other surface and bulk volume effects including the transfer of momentum. Structures and devices are used to insert a mass into a rotating device. While inside the rotating device the mass gains velocity. Transitioning from the rotational system to a stationary surface is accomplished with a minimum of velocity loss by selecting trajectories, air flows, and surface finishes to reduce energy losses in the mass' transition onto the stationary surface and info a fixed stationary guide tube, and ultimately to an impact point. Single and multiple conduits, stationary and rotating, can be used to accomplish complex chemistry and physics affects.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WESTMEYER PAULLANCASTER PA 17602

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Westmeyer, Paul Woodbridge, US 6 13
Woods, Robert Parker Stafford, US 1 1
Woods,, III Robert Edwin Stafford, US 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 2, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 2, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00