Tissue modification devices, systems, and methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10080820
APP PUB NO 20170065744A1
SERIAL NO

15250382

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A tissue modification apparatus includes at least a first plurality of grippers aligned in a plane adapted to secure a first edge of a patch of tissue. The plurality of grippers are each secured to a first force actuator. The first plurality of grippers are each adapted to pivot relative to the first force actuator about an axis perpendicular to the plane. In some cases, a plurality of grippers are attached to a force actuator by a passive force transfer mechanism. In some cases, individual force actuators are attached by pivoted connections to individual grippers. Methods of treating tissue can secure tensioned tissue to a frame to retain the tension during a treatment (e.g., cross-linking the tissue with a chemical cross-linker).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BOSTON SCIENTIFIC SCIMED INCONE SCIMED PLACE MAPLE GROVE MN 55311

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Anderson-Cunanan, Crystal Marie San Jose, US 7 57
Byron, Mary M Roseville, US 37 538
Foster, Daniel J Lino Lakes, US 78 801
McCarthy, Ray Galway, IE 13 7
Swehla, Bradley S Eagan, US 22 54
Wulfman, David Robert Minneapolis, US 16 99

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 25, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 25, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00