Process for preparing a catalyst, catalyst and process for the oxidative dehydrogenation of hydrocarbons

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10065183
APP PUB NO 20160207035A1
SERIAL NO

14914035

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for preparing a catalyst provided in the form of a metal oxide catalyst having at least one element selected from Mo, Te, Nb, V, Cr, Dy, Ga, Sb, Ni, Co, Pt and Ce. The catalyst is subjected to an aftertreatment to increase the proportion of the M1 phase, by contacting the catalyst with steam at a pressure below 100 bar or by contacting the catalyst with oxygen to obtain an aftertreated catalyst. The aftertreated catalyst may be used for oxidative dehydrogenation processes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TECHNISCHE UNIVERSITAT MUNCHENMÜNCHEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hartmann, Daniela Landau, DE 1 7
Hofmann, Karl-Heinz Germering, DE 25 194
Lercher, Johannes A Ottobrunn, DE 6 43
Meiswinkel, Andreas Prien, DE 48 140
Sanchez-Sanchez, Maria Cruz München, DE 5 20
Thaller, Christian München, DE 7 62
van, Veen Andre Cornelis Issum, DE 1 7
Winkler, Florian München, DE 28 223
Zander, Hans-Jörg München, DE 15 49

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 4, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 4, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00