Power generation system exhaust cooling

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10060316
APP PUB NO 20160376960A1
SERIAL NO

14753105

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An airflow control system for a combined cycle turbomachine system in accordance with an embodiment includes: an airflow generation system for attachment to a rotatable shaft of a gas turbine system, the airflow generation system drawing in an excess flow of air through an air intake section; a mixing area for receiving an exhaust gas stream produced by the gas turbine system; an air extraction system for extracting a first portion of the excess flow of air to provide bypass air, and for diverting the bypass air into the mixing area to reduce a temperature of the exhaust gas stream; and an airflow regulation system for diverting a second portion of the excess flow of air into the compressor component and, in response to an under-frequency grid event, for increasing the second portion of the excess flow of air diverted into the compressor component.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE INFRASTRUCTURE TECHNOLOGY LLC300 GARLINGTON ROAD GREENVILLE SC 29615

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Davis,, Jr Lewis Berkley Niskayuna, US 96 1225
Kulkarni, Parag Prakash Niskayuna, US 47 532
Reed, Robert Joseph Simpsonville, US 16 153

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00