Method and system for centrifugal pump

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10060290
APP PUB NO 20170191378A1
SERIAL NO

14984372

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The pump includes a first rotatable member including a radially inward facing groove having an edge. The first rotatable member configured to receive a plurality of flows of fluid over the edge. The first rotatable member configured to rotate at a first angular velocity. The pump also includes a second rotatable member including a collector configured to rotate at a second angular velocity. The second rotatable member also includes a plurality of scoop tubes extending radially outwardly from the collector. Each scoop tube of the plurality of scoop tubes includes a first end coupled in flow communication to the collector and a second end including an inlet opening extending into the groove. The second end curved such that the inlet opening is open in a direction of rotation of the second rotatable member. The inlet opening configured to scoop a fluid collected in the groove.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GENERAL ELECTRIC COMPANY1 RIVER ROAD SCHENECTADY NY 12345

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Becker,, Jr Thomas Lee Symmes Township, US 6 72
Moniz, Thomas Ory Loveland, US 131 3948

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00