H-section steel and method of producing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10060002
APP PUB NO 20160376675A1
SERIAL NO

15039753

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An H-section steel has a predetermined chemical composition in which Ti oxides having a grain size of 0.01 μm to 3.0 μm are included at a density of 30 pieces/mm2 or more, a thickness of a flange is 100 mm to 150 mm, an area fraction of bainite at a ⅙ position from a surface of the flange in a length direction and at a ¼ position from the surface thereof in a thickness direction is 80% or more, a yield strength or 0.2% proof stress is 450 MPa or more, and a tensile strength is 550 MPa or more, a Charpy absorbed energy at 21° C. at a ½ position from the surface of the flange in the length direction and at a ¾ position from the surface thereof in the thickness direction is 100 J or more, and an average austenite grain size is 50 μm to 200 μm.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON STEEL CORPORATIONTOKYO JAPAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ichikawa, Kazutoshi Kimitsu, JP 14 29
Mitsuyasu, Kazuaki Osaka, JP 7 11
Mizoguchi, Masaki Kimitsu, JP 13 28
Sugiyama, Hirokazu Tokyo, JP 36 115

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00