Composition and method for depolymerization of cured epoxy resin materials using transition metal salts

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10106421
APP PUB NO 20170174523A1
SERIAL NO

15380460

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

For depolymerization of a cured epoxy resin material, used is a composition including a transition metal salt or a transition metal oxide containing a transition metal element (metal element that belongs to Groups 3-12 in the Periodic Table). In the reaction solvent, an oxidation occurs by the medium of the transition metal element so that the cured epoxy resin material may be depolymerized and decomposed. In this manner, it is possible to carry out depolymerization of a cured epoxy resin material at a temperature of 200° C., specifically 100° C. or lower very simply and rapidly, and to reduce the processing cost and energy requirement.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOREA INSTITUTE OF SCIENCE AND TECHNOLOGY5 HWARANG-RO 14-GIL SEONGBUK-GU SEOUL 02792 02792

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Goh, Munju Wanju-gun, KR 13 28
Jung, Jin Wanju-gun, KR 29 208
Ku, Bon-Cheol Wanju-gun, KR 30 136
Yeo, Hyeonuk Wanju-gun, KR 10 8
You, Nam Ho Wanju-gun, KR 16 26
Youn, Sang Jun Wanju-gun, KR 9 78
Yu, Jin Won Wanju-gun, KR 3 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 23, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 23, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00