Emulator for optimizing energy consumption management systems

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10054918
APP PUB NO 20170063083A1
SERIAL NO

14835600

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for calculating feasibility of an electrical energy consumption management system (CMS) includes receiving a first historical energy consumption profile of an energy consumer for a first time period and a second historical energy consumption profile of the energy consumer for a second time period, wherein the second time period is after the first time period. The process may also include determining a setpoint for a CMS, wherein the CMS has hardware specifications, and wherein the setpoint is based on the first historical energy consumption profile and the hardware specifications. Next, an energy savings that would be produced by the CMS over the second time period is determined and a feasibility rating is assigned to the CMS based on the first energy savings and the first hardware specifications. A customer may thereby determine or optimize the effectiveness of a CMS at his site before it is purchased and installed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ENGIE STORAGE SERVICES NA LLC4151 BURTON DR SANTA CLARA CA 95054

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Holzman, Mathew Redwood City, US 2 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 21, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 21, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00