Characterization of non-radioactive laced cement using logging while drilling and wireline nuclear measurements

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10053979
APP PUB NO 20180087376A1
SERIAL NO

15274277

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of performing a wellbore operation includes: circulating a doped wellbore fluid comprising a non-radioactive doped particulate material in a wellbore; and logging the wellbore with a logging-while-drilling tool to determine at least one characteristic of the doped wellbore fluid. A method of performing a wellbore operation includes: circulating a doped wellbore fluid comprising a non-radioactive doped particulate material in a wellbore; logging the wellbore with a logging tool; and determining a location of at least one fracture by elemental spectroscopy measurements.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SCHLUMBERGER TECHNOLOGY CORPORATION300 SCHLUMBERGER DRIVE SUGAR LAND TX 77478

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ahrenst, Alex Sugar Land, US 3 64
Bogaerts, Martinus Johannes Bernardus Rosenberg, US 2 9
Miles, Jeffrey Arlington, US 21 73
Peternell, Ana Youngsville, US 1 3
Rasmus, John Richmond, US 37 332

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 21, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 21, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00