Display control device for meter

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10053003
APP PUB NO 20170341570A1
SERIAL NO

15606969

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

When an automatic transmission shift start condition is satisfied, an electronic control unit calculates a meter target rotational speed of an engine by adding a correction amount corresponding to the state of a torque converter to a turbine rotational speed corresponding to a post-shift gear stage, and makes a meter display rotational speed follow after the meter target rotational speed, fixes the correction amount to a value obtained at the time of shift start determination, when immobilization conditions including that the shift start condition for a downshift is satisfied and that the engine is driven are satisfied. When actual rotational speed display conditions are satisfied, it can be predicted that differences between an engine rotational speed and a turbine rotational speed before and after shifting are large, and so the electronic control unit sets a current engine rotational speed as the meter target rotational speed or ends the control.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kanai, Osamu Nagoya, JP 10 58
Murakami, Yuki Toyota, JP 31 82
Teratani, Yoshiyuki Nagoya, JP 4 17

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 21, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 21, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00