Optical probe and optical coherence tomography apparatus including the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10048055
APP PUB NO 20130176572A1
SERIAL NO

13737370

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An optical probe for irradiating light onto a subject includes an optical path control unit configured to receive light from outside the optical probe, and change a path of the light within the optical probe; an optical path length control element configured to receive the light having the changed path from the optical path control unit, and change an optical path length of the light as the optical path control unit changes the path of the light; and an optical output unit configured to receive the light having the changed optical path length from the optical path length control element, and output the light.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRONICS CO LTDSUWON-SI GYEONGGI-DO 16677
KOREA UNIVERSITY RESEARCH AND BUSINESS FOUNDATIONSEOUL 02841

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Choe, Won-he Seoul, KR 1 10
Choi, Hyun Seoul, KR 87 571
Choi, Min-seog Seoul, KR 43 764
Jang, Woo-young Seongnam-si, KR 54 714
Jeong, Hyun-woo Seoul, KR 3 12
Kim, Beop-min Seoul, KR 8 15
Lee, Seong-deok Seongnam-si, KR 161 2505
Lim, Jae-guyn Seongnam-si, KR 39 675

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 14, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 14, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00