Modular bridge, a bridge module for a modular bridge, and methods for assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10041216
APP PUB NO 20170191232A1
SERIAL NO

15301941

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A modular bridge is formed from a plurality of bridge modules. In one embodiment, the bridge includes: a first longitudinal compression member that is, in use, at an upper part of the bridge cross-section; a second longitudinal compression member that is, in use, at a lower part of the bridge cross-section; a structural lateral element for forming a deck of the bridge or for supporting deck elements of the bridge; a shear element for carrying a shear load; and a tension member applying a compressive force to one of the longitudinal compression members such that when in use the other of the longitudinal compression members forms a main compression element for the bridge and the tension member forms a main tension element for the bridge. The bridge modules form segments of the length of the bridge and each bridge module is of a one-piece construction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OVE ARUP VENTURES LIMITEDLONDON W1T 4BQ

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Trim, Roland Bristol, GB 1 7
Wise, Ian Bristol, GB 1 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 7, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 7, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00