Slab bridge structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10036130
SERIAL NO

15518935

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A slab bridge structure having improved rigid connection strength between bridge girders and concrete piers. The slab bridge structure has a rigid connection structure in which slab concrete (3) is poured between side surfaces of bridge girders (1) arranged in line in a bridge width direction, throughout a longitudinal direction of the bridge girders, connection concrete (12) in which bridge girder portions (1′) supported by a bridge seat (2a) of a concrete pier (2) that supports the bridge girders are embedded is further added onto the bridge seat, and the slab concrete and the concrete pier are concrete-joined through the connection concrete, the slab bridge structure further includes: a connecting rod (13) embedded in the concrete pier and projecting upward from the bridge seat of the pier; and a connecting plate (14) connecting upper end portions of the adjacent bridge girder portions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ASAHI ENGINEERING CO LTDKANAZAWA-SHI ISHIKAWA-KEN
AE JAPAN CO LTD3-9-6 MITSUKUCHISHINMACHI KANAZAWA-SHI ISHIKAWA 9200944

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tokuno, Mitsuhiro Ishikawa, JP 9 38

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 31, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 31, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00