Pellet boiler with removable grate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10030870
SERIAL NO

14388796

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to burners and boiler structures of heating systems which work with solid fuel or which work especially with wood pellets, olive stones and other similar propellants. The burner has a “C”-shaped grate structure comprising a grate mount (4.2) for opening and closing an ash discharging mouth, and the top grate made up by the following components: Grate arms (4.1.2) that can move at a horizontal angle over connecting grate shafts (4.1.3) independent from each other; grate shims (4.1.4) located on the grate shafts (4.1.3) and between the grate arms (4.1.2); a shank (4.1.5) connecting the grate arms (4.1.2) to a grate frame (4.1.1), and the top grate to the grate mount (4.2), thus enabling the top grate to move in an upwards or downwards motion limited by supports (4.1.7, 4.1.8). Furthermore, the burner comprises uneven rails on which the top grate moves guided by guide pins (4.1.6).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ARIKAN ZEKI06700 ANKARA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Arikan, Zeki Ankara, TR 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 24, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 24, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00