Concentric growth ring baseball bat

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10029389
SERIAL NO

15530348

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A baseball bat fabricated from a limb of a tree, procured without harvesting any of the tree's trunk. Because of this technique, the process of the present invention is much less wasteful. Many bats can be fabricated from a single tree, without felling the tree itself. The process of fabrication of the present invention is drawn to working with the properties of the harvested tree limb. In this manner, a billet is fabricated on a lathe with its center placed concentric with the center of the tree limb, thusly concentric with the limb's growth rings. By doing so, the growth rings within the limb will not be bisected during fabrication of the billet. When the billet is further turned on a lathe to shape the billet into a baseball bat, the growth rings within the limb will be minimally bisected, thus increasing the strength of the baseball bat of the present invention, as compared to the baseball bats of the prior art.

First Claim

See full text

Other Claims data not available

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BAKER TEDDY HOWARDBURNESVILLE NC

International Classification(s)

loading....
  • 2016 Application Filing Year
  • B27M Class
  • 31 Applications Filed
  • 23 Patents Issued To-Date
  • 74.20 % Issued To-Date
Click to zoom InYear of Issuance% of Matters IssuedCumulative IssuancesYearly Issuances2016201720182019202020212022202320240255075100

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baker, Teddy Howard Burnesville, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • 0 Citation Count
  • B27M Class
  • 0 % this patent is cited more than
  • 7 Age
Citation count rangeNumber of patents cited in rangeNumber of patents cited in various citation count ranges1611101 - 1011 - 2001234567891011121314151617

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 24, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 24, 2030