Arbitrating circuit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10027330
SERIAL NO

15889740

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An arbitrating circuit includes a first NOR gate, a second NOR gate, four resistors and a pull-up circuit. The first transistor is connected with the first node and the second node, and generates a first acknowledging signal. The second transistor is connected with a supply voltage, the second node and the first transistor. The third transistor is connected with the first node and second node, and generates a second acknowledging signal. The fourth transistor is connected with the supply voltage, the first node and the third transistor. The pull-up circuit is connected with the first node, the second node, the first NOR gate and the second NOR gate. If both of the first request signal and the second request signal have a low logic level, a voltage at the second node is pulled up to a high logic level by the pull-up circuit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FARADAY TECHNOLOGY CORPORATIONHSINCHU

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lin, Shih-Chin Hsinchu, TW 68 326
Wang, Wei-Chang Hsinchu, TW 9 3
Zhang, Zhao-Yong Hsinchu, TW 5 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 17, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 17, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00