Power supply for critical railroad equipment

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10027142
SERIAL NO

15040750

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power supply system for an electrical equipment comprises a first power supply module for supplying power to the electrical equipment, wherein the first power supply module is connectable to a first electrical network and is adapted for converting a first input current from the first electrical network to an output current suppliable to the electrical equipment; a second power supply module for supplying electrical power to the electrical equipment, wherein the second power supply module is connectable to a second electrical network of different frequency and/or different voltage as the first electrical network and is adapted for converting a second input current from the second electrical network to the output current, when the first power supply module is not able to converting the first input current; and an electrical energy storage for supplying electrical power to the electrical equipment, wherein the electrical energy storage is adapted for providing the output current, when the first and/or second power supply module is not able to convert the first and/or second input current.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ABB SCHWEIZ AG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Birrer, Markus Untersiggenthal, CH 1 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 17, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 17, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00