Fabricating apparatus and method for secondary battery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10008734
SERIAL NO

14791134

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a fabricating apparatus for a secondary battery, the fabricating apparatus including: a base material supplier configured to supply a base material; a winder configured to wind the base material through a mandrel; and a controller configured to control a base material supply amount of the base material supplier and a mandrel rotation amount of the winder, wherein the controller is further configured to store a profile of the base material supply amount with respect to the mandrel rotation amount, and to synchronously control the base material supply amount and the mandrel rotation amount based on the profile.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG SDI CO LTD150-20 GONGSE-RO GIHEUNG-GU YONGIN-SI GYEONGGI-DO 17084

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cho, Gibong Yongin-si, KR 5 36
Choi, Kyungtaek Yongin-si, KR 5 36
Hong, Jinuk Yongin-si, KR 4 36
Hwang, Soonhak Yongin-si, KR 4 36
Kim, Dongwoo Yongin-si, KR 207 2324
Kim, Kyuho Yongin-si, KR 7 58
Lee, Seunghwan Yongin-si, KR 80 1786
Maeng, Sangjin Yongin-si, KR 4 36
Min, Jungki Yongin-si, KR 6 38

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00